This project was a sleeved force main sewer and waterline to the historic Tarabochia net shed at the mouth of gig harbor bay. Scope was fusing 4 inch Hdpe pipe to go from an existing subdivision down to the net shed. Sewer and waterline pipes then resleeved inside the 4 inch Hdpe for protection.